- 13. Reference Notes
- Glossary
-
Glossary
- PTO VISA: the architecture-visible virtual ISA contract for PTO.
- Target profile: a target-specific narrowing of the portable PTO ISA, such as CPU simulation, A2/A3-class, or A5-class support.
- Tile instructions: the
pto.t* instruction set.
- Vector instructions: the
pto.v* instruction set.
- Scalar/control instructions: the
pto.* supporting scalar, control, and configuration instruction set.
- Valid region: the subset of a physical tile whose values are architecturally meaningful.
- Location intent: the role or storage intent that affects legality.